0–9
- 5S
- Sort, set in order, shine, standardise and sustain (Seiri, Seiton, Seiso, Seiketsu, Shitsuke): five steps to keep the workplace orderly and visible.
- 5S steps
- Seiri (sort), Seiton (set in order), Seiso (shine), Seiketsu (standardise) and Shitsuke (sustain): the five Japanese steps of 5S.
- 8D
- Eight-disciplines problem solving: team, problem description, containment, root cause, permanent fix, implementation and verification, prevention and closure.
A
- A3
- A structured problem-solving report that tells a problem on a single A3 sheet: current state, target, root cause, countermeasures and follow-up.
- Acceptable risk
- The level of risk the organisation decides to carry after considering legal requirements, its policy and existing controls; an explicit threshold rather than a zero-risk goal.
- Andon
- A warning system that shows the line's status to everyone with a light, board or sound and calls for help when there is a problem.
- Anonymous report
- A complaint or report made without the reporter's identity being written on the record; it brings out topics that fear of retaliation keeps silent.
- Anonymous survey
- A survey in which answers are not linked to a person and results are shown only for groups above a minimum size set in advance.
- API
- Application programming interface: the defined door through which a piece of software opens its data and functions to other software; machines talking instead of screens.
- Asset assignment
- Handing a company item to a named employee while recording who received what, on which day and in what condition.
- Attendance tracking
- Recording which days and shifts an employee is at work, with leave, sick notes and overtime; the basis for shift plans and training attendance.
- Audit trail
- The record of who did what and when in a system, never deleted and queryable afterwards; the answer to the auditor's "who changed this?" question.
B
- Bottleneck
- The step in a flow with the lowest capacity, which sets the pace of the whole line; stock builds up before it and everything after it waits.
- Bowling chart
- A tracking table that shows target and actual values of Hoshin indicators month by month and marks deviations by colour.
C
- Calibration
- Comparing the value a measuring device shows with a traceable reference and determining its deviation and uncertainty; adjusting the device and deciding conformity are separate steps.
- CAPA (DÖF)
- Corrective and preventive action: finding and removing the root cause of a non-conformity and preventing it from happening again.
- Catchball
- In Hoshin, goals going down and projects coming up for a few rounds until both are agreed together; the name likens it to tossing a ball.
- Committee (review board)
- The board that reviews, scores and decides rewards for suggestion and Kaizen applications at set intervals; the decision point of the participation system.
- Company memory
- An organisation's past problems, solutions and decisions being findable and reusable independently of individuals; knowledge does not leave when a person leaves.
- Competence matrix
- A table (also called a skills matrix) that shows the competences each role needs next to each person's level in those skills; it shows who knows what and who can step in for whom.
- Continual improvement
- Taking processes, products and ways of working to a better place in small steps and in a cycle that never ends; clause 10.3 in ISO 9001.
- Control plan
- A document that states what is checked at each production step, how, how often and within which limits; it follows on from the FMEA.
- Cost of quality (COQ)
- The total money spent on preventing defects, checking for them and fixing their internal and external consequences; it makes the hidden factory visible.
- Critical position
- A role whose vacancy directly affects production, safety, a legal obligation or the customer, and for which a replacement is hard to find.
- Cross-training
- Employees learning stations and tasks beyond their own job; it gives flexibility in absence, shift changes and demand swings.
- Customer complaint
- A customer reporting dissatisfaction with a product or service; a source of non-conformity that needs a record, an investigation and an answer.
- Cycle time
- The time one unit of work takes at a station from start to finish; comparing it with takt time reads the balance of the line.
D
- Data controller
- The natural or legal person who decides the purpose and means of processing personal data and is responsible for the data filing system; a processor acts on its behalf.
- Deputising (acting approver)
- An approver handing their authority to another person for a set period during leave, illness or travel; it keeps work from stalling while waiting for approval.
- Document control
- Writing, approving and releasing procedures, instructions and forms and making sure the current version is with the right people; clause 7.5 in ISO 9001.
E
- Effectiveness check
- Checking with data, some time after implementation, whether a measure really solved the problem; the last step of corrective action.
- Emergency drill
- Trying the emergency plan without a real event, announced or unannounced; evacuation time and gaps are measured.
- Emergency plan
- A document stating who does what in a fire, chemical spill, earthquake or similar event, with assembly points, teams and communication; it is tested with drills.
- Energy efficiency
- Doing the same work with less energy; it is measured by relating consumption to output and is the core aim of an ISO 50001 management system.
- Energy performance indicator (EnPI)
- A measure that tracks energy consumption against a variable that affects it, such as output or temperature (for example kWh per tonne); EnPI in ISO 50001.
- Environmental aspect
- The element of an organisation's activity, product or service that interacts with the environment (emissions, waste, water, chemicals); if its impact is significant it becomes a "significant environmental aspect". Clause 6.1.2 in ISO 14001.
- Ergonomics
- Fitting the job, the tool and the workplace to the human body and its abilities; it reduces musculoskeletal strain, fatigue and errors.
- Estimated savings
- Calculating the gain an improvement is expected to bring before it is implemented; it is never confused with verified savings or added to them.
- Evidence chain
- Keeping who added a record and its linked evidence (photos, documents, approvals), when and in what order, in a form that cannot be changed afterwards.
- Explicit consent
- Consent a person gives on a specific matter, informed and of their own free will; under KVKK it is the basis for processing in cases such as special categories of data.
- External audit
- An auditor from outside the organisation (certification body, customer, authority) examining the management system or a process on site; separate from internal audit.
F
- First pass yield (FPY)
- The share of units that pass a process on the first try without rework or repair; it brings hidden rework into the open.
- Fishbone (Ishikawa) diagram
- A diagram that shows the possible causes of a problem on branches; the branches are usually the 6M: man, machine, material, method, measurement and mother nature (environment).
- FMEA
- Failure mode and effects analysis: scoring and prioritising possible failures by severity, occurrence and detection.
G
- Gemba
- Japanese for "the real place": where the work is done. A Gemba walk means a manager sees the problem on site, not at a desk.
- Genchi genbutsu
- Japanese for "go and see for yourself": the principle of going to where a problem is and seeing the data and the work with your own eyes.
H
- Hansei (reflection)
- Japanese for "reflection": the habit of looking honestly at what went well and what fell short after a job and writing down the lesson.
- Hazard
- A source, situation or act with the potential to cause injury, illness or damage; risk is this hazard combined with likelihood and severity.
- Heijunka (production levelling)
- A planning approach that balances product mix and volume over a period so order swings do not hit the floor as hard.
- Hoshin Kanri
- A policy deployment method that links long-term goals to annual goals, improvement projects and indicators; usually shown in an X-matrix.
- Hoshin X-matrix
- The one-page Hoshin table that links long-term goals, annual goals, improvement projects and indicators on its four sides.
I
- IATF 16949
- The quality management system standard of the automotive supply chain; on top of ISO 9001 it adds customer-specific requirements and tools such as FMEA, control plans and 8D.
- Interested party
- A person or organisation that is affected by, or can affect, the organisation's decisions; a stakeholder. Clause 4.2 in ISO 9001.
- Internal audit
- An organisation auditing its own management system with its own auditors under a planned programme; ISO 9001 requires it. It is separate from the external certification audit.
- ISO 14001
- The environmental management system standard: it requires the organisation to identify its environmental aspects, comply with legal requirements and improve environmental performance.
- ISO 45001
- The occupational health and safety management system standard: built on identifying hazards, managing risks and worker participation.
- ISO 50001
- The energy management system standard: it requires reviewing energy use, setting a baseline and performance indicators and improving consumption continually.
J
- Jidoka (autonomation)
- A machine or a person stopping the process when an abnormality appears so the defect does not move to the next step; automation with a human touch.
K
- Kaizen
- Japanese for "change for the better": small, continuous improvements made with the participation of everyone who does the work.
- Kanban
- Japanese for "card": a signal that tells the previous process what the next process needs; the tool of a pull system.
- Kobetsu Kaizen
- The focused-improvement pillar of total productive maintenance (TPM): a project that reduces one specific loss (downtime, scrap, setup) through teamwork.
- KVKK
- Turkey's Personal Data Protection Law (Law 6698): it governs for what purpose and on what legal basis personal data is processed, kept and deleted.
L
- Layered process audit (Kamishibai)
- An audit in which each management layer answers a short card on the floor at a set frequency; the name comes from Japanese card theatre.
- Lockout tagout (LOTO)
- Isolating, locking and tagging a machine's energy during maintenance or cleaning; the machine is released only by the person who applied the lock.
M
- Management of change (MOC)
- Assessing and approving the impact of a machine, method, material or software change before it is applied; it keeps a change from bringing in new risk.
- Management review
- The meeting and records in which senior management evaluates the management system at planned intervals. Clause 9.3 in ISO 9001.
- Management system
- The arrangement that holds an organisation's policy, objectives, processes, responsibilities and records together; ISO 9001, 14001 and 45001 set requirements for it.
- Mean time between failures (MTBF)
- A measure of how long a repairable piece of equipment runs, on average, between two failures: total operating time divided by the number of failures.
- Measurement system analysis (MSA)
- Studying how consistently a measuring device and the people using it measure the same part; done so that measurement error is not mistaken for process error.
- Muda (waste)
- Japanese for "waste": any work the customer does not pay for. The seven classic wastes are overproduction, waiting, transport, over-processing, inventory, motion and defects; most lists count unused employee talent as the eighth.
- Multi-tenancy
- One software installation serving several companies; each company's data is kept apart and one company cannot see another's records.
N
- Near miss
- An event that did not result in injury or damage but could have.
- Nemawashi
- Japanese for "preparing the roots": talking to everyone concerned one by one before the formal meeting to gather views and support for a decision.
- Non-conformity
- A requirement (standard, procedure, customer or legal requirement) not being met; it can be an audit finding, a defective product or a skipped check.
O
- OEE (overall equipment effectiveness)
- A measure of how much of the planned time a machine or line actually spends producing value; the product of availability, performance and quality rates.
- Onboarding
- The programme in which a new employee learns the workplace, rules, safety and their own job step by step in the first days; settling in, planned.
- One Point Lesson (OPL)
- Short training material that explains one topic on one page, mostly with visuals.
- One-piece flow
- Parts moving one at a time from station to station without waiting in batches; waiting, stock and the spread of defects fall.
P
- PDCA cycle
- Plan, do, check, act: the four-step cycle of improvement; also known as the Deming cycle.
- Persistence tracking
- Re-measuring months later whether a verified gain still holds; it exposes improvements that survived only on paper.
- Poka-Yoke
- A simple device or method that prevents a mistake or makes it visible the moment it happens; "mistake-proofing".
- PPE (personal protective equipment)
- Equipment worn by the worker to protect from a hazard: helmet, goggles, gloves, mask, harness; it is the last rung in the order of controls.
- PPM (parts per million)
- Defective parts expressed per million parts; it is used instead of percent because defect rates in sectors such as automotive are very small.
- Preventive action
- Work that removes the cause of a non-conformity that has not happened yet; unlike corrective action it does not wait for the problem to appear.
- Pull system
- Each step producing only what the next step has actually consumed; production does not start without a signal (Kanban).
R
- Red tag
- A tag attached in the sort step of 5S to material, tools or equipment whose need is unclear; it records what the item is, why it was tagged and the decision date.
- Restore drill
- Regularly trying whether a backup can really be restored; until it is restored, a backup is only a file.
- Reward shop
- The list where points earned by participation are exchanged for chosen rewards; part of gamification and kept separate from the reward the committee grants.
- Risk assessment
- Scoring a hazard or uncertainty by likelihood and severity and putting it in order of priority; risks and opportunities in ISO 9001 (clause 6.1), hazard-based risk in EHS.
- Risk matrix
- A table where likelihood and severity meet in rows and columns, giving each cell a risk level and colour; 5x5 is the most common form.
- Risk-based thinking
- The approach that came with the 2015 edition of ISO 9001: thinking ahead in every process about what could go wrong and which opportunity could be missed, and planning measures.
- Root cause
- The deepest cause of a problem, the one whose removal keeps the problem from coming back; removing the symptom does not count.
- Root cause analysis (5 Whys)
- Working down from the visible symptom of a problem to its real source; the 5 Whys method reaches the root cause by asking "why?" repeatedly.
- RPO and RTO
- The recovery point objective (RPO) says at most how many minutes of data may be lost in an outage; the recovery time objective (RTO) says how long the system takes to come back.
S
- Safety data sheet (SDS)
- A document that describes a chemical's hazards, safe use, protective equipment and emergency measures in sixteen sections; the supplier provides it.
- Shift handover
- Passing the notes, open topics and events of a finished shift to the incoming shift in writing and with approval; it puts on record what a verbal handover forgets.
- Single sign-on (SSO)
- A user signing in once with the company account and entering several applications without separate passwords; the company's identity provider verifies the identity.
- SMED (quick changeover)
- Single-Minute Exchange of Die: a method for shortening die or product changeover time; it splits changeover steps into internal (machine stopped) and external (machine running).
- Spaghetti diagram
- Drawing the path a person or material follows during a job as a line on the layout plan; it shows unnecessary walking and transport.
- SQCD
- Safety, quality, cost and delivery: the four headings of indicators in daily shop-floor management; some plants add people (P) or morale (M).
- Standard work
- Writing down the best currently known way of doing a job with its steps, sequence, time and checkpoints; the starting line for improvement.
- Suggestion system
- An arrangement in which employees submit ideas to improve the workplace in writing, the idea is evaluated and answered, and an implemented idea is recognised.
- Supplier evaluation
- Selecting, monitoring and periodically re-scoring the providers of bought-in products and services against written criteria. An on-site review of a supplier by the customer is called a second-party audit.
T
- Takt time
- The rhythm of customer demand: available production time divided by the number of units demanded; it says how many seconds apart each unit must come out.
- TPM (total productive maintenance)
- An approach in which operators, maintenance and management reduce machine losses together; autonomous maintenance (operators cleaning, inspecting and lubricating) and focused improvement are its main pillars.
- Two-factor authentication
- Asking for a second proof at sign-in besides the password: a one-time code on the phone, a hardware key or a passkey; a stolen password alone is not enough.
V
- Value stream map (VSM)
- A drawing that shows on one page the steps a product passes through from raw material to customer, with waiting times and information flow.
- Verified savings
- The gain from an improvement calculated by measurement rather than estimate and approved by finance; estimate, measurement and the approved amount are kept apart.
- Visual management
- Showing floor status, the standard and any deviation so they are understood at a glance; it works with colour, lines, boards and labels.
W
- Waste hierarchy
- The order of priority for dealing with waste: prevention, reduction, reuse, recycling, energy recovery and disposal last.
- Webhook
- Software sending a short notification to a set address on its own when an event happens (record closed, action overdue); telling instead of being polled.
- Work instruction
- A document that explains step by step how a job is done; each step states what to do, what to measure and which limit is accepted.
- Work permit
- A document that keeps hazardous work such as hot work, work at height or confined-space entry from starting until the set prerequisites are met and an authorised person approves.
Y
- Yokoten (roll-out)
- Japanese for "horizontal deployment": carrying an improvement that worked in one area to similar areas; learning by adapting, not copying.