The language of the floor: a continuous improvement glossary

The terms used most on the shop floor and in management systems: a short definition, how it is applied and where it lives in the product. Definitions are general knowledge; the "In the product" section describes only what the product does.

0–9

5S
Sort, set in order, shine, standardise and sustain (Seiri, Seiton, Seiso, Seiketsu, Shitsuke): five steps to keep the workplace orderly and visible.
5S steps
Seiri (sort), Seiton (set in order), Seiso (shine), Seiketsu (standardise) and Shitsuke (sustain): the five Japanese steps of 5S.
8D
Eight-disciplines problem solving: team, problem description, containment, root cause, permanent fix, implementation and verification, prevention and closure.

A

A3
A structured problem-solving report that tells a problem on a single A3 sheet: current state, target, root cause, countermeasures and follow-up.
Acceptable risk
The level of risk the organisation decides to carry after considering legal requirements, its policy and existing controls; an explicit threshold rather than a zero-risk goal.
Andon
A warning system that shows the line's status to everyone with a light, board or sound and calls for help when there is a problem.
Anonymous report
A complaint or report made without the reporter's identity being written on the record; it brings out topics that fear of retaliation keeps silent.
Anonymous survey
A survey in which answers are not linked to a person and results are shown only for groups above a minimum size set in advance.
API
Application programming interface: the defined door through which a piece of software opens its data and functions to other software; machines talking instead of screens.
Asset assignment
Handing a company item to a named employee while recording who received what, on which day and in what condition.
Attendance tracking
Recording which days and shifts an employee is at work, with leave, sick notes and overtime; the basis for shift plans and training attendance.
Audit trail
The record of who did what and when in a system, never deleted and queryable afterwards; the answer to the auditor's "who changed this?" question.

B

Bottleneck
The step in a flow with the lowest capacity, which sets the pace of the whole line; stock builds up before it and everything after it waits.
Bowling chart
A tracking table that shows target and actual values of Hoshin indicators month by month and marks deviations by colour.

C

Calibration
Comparing the value a measuring device shows with a traceable reference and determining its deviation and uncertainty; adjusting the device and deciding conformity are separate steps.
CAPA (DÖF)
Corrective and preventive action: finding and removing the root cause of a non-conformity and preventing it from happening again.
Catchball
In Hoshin, goals going down and projects coming up for a few rounds until both are agreed together; the name likens it to tossing a ball.
Committee (review board)
The board that reviews, scores and decides rewards for suggestion and Kaizen applications at set intervals; the decision point of the participation system.
Company memory
An organisation's past problems, solutions and decisions being findable and reusable independently of individuals; knowledge does not leave when a person leaves.
Competence matrix
A table (also called a skills matrix) that shows the competences each role needs next to each person's level in those skills; it shows who knows what and who can step in for whom.
Continual improvement
Taking processes, products and ways of working to a better place in small steps and in a cycle that never ends; clause 10.3 in ISO 9001.
Control plan
A document that states what is checked at each production step, how, how often and within which limits; it follows on from the FMEA.
Cost of quality (COQ)
The total money spent on preventing defects, checking for them and fixing their internal and external consequences; it makes the hidden factory visible.
Critical position
A role whose vacancy directly affects production, safety, a legal obligation or the customer, and for which a replacement is hard to find.
Cross-training
Employees learning stations and tasks beyond their own job; it gives flexibility in absence, shift changes and demand swings.
Customer complaint
A customer reporting dissatisfaction with a product or service; a source of non-conformity that needs a record, an investigation and an answer.
Cycle time
The time one unit of work takes at a station from start to finish; comparing it with takt time reads the balance of the line.

D

Data controller
The natural or legal person who decides the purpose and means of processing personal data and is responsible for the data filing system; a processor acts on its behalf.
Deputising (acting approver)
An approver handing their authority to another person for a set period during leave, illness or travel; it keeps work from stalling while waiting for approval.
Document control
Writing, approving and releasing procedures, instructions and forms and making sure the current version is with the right people; clause 7.5 in ISO 9001.

E

Effectiveness check
Checking with data, some time after implementation, whether a measure really solved the problem; the last step of corrective action.
Emergency drill
Trying the emergency plan without a real event, announced or unannounced; evacuation time and gaps are measured.
Emergency plan
A document stating who does what in a fire, chemical spill, earthquake or similar event, with assembly points, teams and communication; it is tested with drills.
Energy efficiency
Doing the same work with less energy; it is measured by relating consumption to output and is the core aim of an ISO 50001 management system.
Energy performance indicator (EnPI)
A measure that tracks energy consumption against a variable that affects it, such as output or temperature (for example kWh per tonne); EnPI in ISO 50001.
Environmental aspect
The element of an organisation's activity, product or service that interacts with the environment (emissions, waste, water, chemicals); if its impact is significant it becomes a "significant environmental aspect". Clause 6.1.2 in ISO 14001.
Ergonomics
Fitting the job, the tool and the workplace to the human body and its abilities; it reduces musculoskeletal strain, fatigue and errors.
Estimated savings
Calculating the gain an improvement is expected to bring before it is implemented; it is never confused with verified savings or added to them.
Evidence chain
Keeping who added a record and its linked evidence (photos, documents, approvals), when and in what order, in a form that cannot be changed afterwards.
Explicit consent
Consent a person gives on a specific matter, informed and of their own free will; under KVKK it is the basis for processing in cases such as special categories of data.
External audit
An auditor from outside the organisation (certification body, customer, authority) examining the management system or a process on site; separate from internal audit.

F

First pass yield (FPY)
The share of units that pass a process on the first try without rework or repair; it brings hidden rework into the open.
Fishbone (Ishikawa) diagram
A diagram that shows the possible causes of a problem on branches; the branches are usually the 6M: man, machine, material, method, measurement and mother nature (environment).
FMEA
Failure mode and effects analysis: scoring and prioritising possible failures by severity, occurrence and detection.

G

Gemba
Japanese for "the real place": where the work is done. A Gemba walk means a manager sees the problem on site, not at a desk.
Genchi genbutsu
Japanese for "go and see for yourself": the principle of going to where a problem is and seeing the data and the work with your own eyes.

H

Hansei (reflection)
Japanese for "reflection": the habit of looking honestly at what went well and what fell short after a job and writing down the lesson.
Hazard
A source, situation or act with the potential to cause injury, illness or damage; risk is this hazard combined with likelihood and severity.
Heijunka (production levelling)
A planning approach that balances product mix and volume over a period so order swings do not hit the floor as hard.
Hoshin Kanri
A policy deployment method that links long-term goals to annual goals, improvement projects and indicators; usually shown in an X-matrix.
Hoshin X-matrix
The one-page Hoshin table that links long-term goals, annual goals, improvement projects and indicators on its four sides.

I

IATF 16949
The quality management system standard of the automotive supply chain; on top of ISO 9001 it adds customer-specific requirements and tools such as FMEA, control plans and 8D.
Interested party
A person or organisation that is affected by, or can affect, the organisation's decisions; a stakeholder. Clause 4.2 in ISO 9001.
Internal audit
An organisation auditing its own management system with its own auditors under a planned programme; ISO 9001 requires it. It is separate from the external certification audit.
ISO 14001
The environmental management system standard: it requires the organisation to identify its environmental aspects, comply with legal requirements and improve environmental performance.
ISO 45001
The occupational health and safety management system standard: built on identifying hazards, managing risks and worker participation.
ISO 50001
The energy management system standard: it requires reviewing energy use, setting a baseline and performance indicators and improving consumption continually.

J

Jidoka (autonomation)
A machine or a person stopping the process when an abnormality appears so the defect does not move to the next step; automation with a human touch.

K

Kaizen
Japanese for "change for the better": small, continuous improvements made with the participation of everyone who does the work.
Kanban
Japanese for "card": a signal that tells the previous process what the next process needs; the tool of a pull system.
Kobetsu Kaizen
The focused-improvement pillar of total productive maintenance (TPM): a project that reduces one specific loss (downtime, scrap, setup) through teamwork.
KVKK
Turkey's Personal Data Protection Law (Law 6698): it governs for what purpose and on what legal basis personal data is processed, kept and deleted.

L

Layered process audit (Kamishibai)
An audit in which each management layer answers a short card on the floor at a set frequency; the name comes from Japanese card theatre.
Lockout tagout (LOTO)
Isolating, locking and tagging a machine's energy during maintenance or cleaning; the machine is released only by the person who applied the lock.

M

Management of change (MOC)
Assessing and approving the impact of a machine, method, material or software change before it is applied; it keeps a change from bringing in new risk.
Management review
The meeting and records in which senior management evaluates the management system at planned intervals. Clause 9.3 in ISO 9001.
Management system
The arrangement that holds an organisation's policy, objectives, processes, responsibilities and records together; ISO 9001, 14001 and 45001 set requirements for it.
Mean time between failures (MTBF)
A measure of how long a repairable piece of equipment runs, on average, between two failures: total operating time divided by the number of failures.
Measurement system analysis (MSA)
Studying how consistently a measuring device and the people using it measure the same part; done so that measurement error is not mistaken for process error.
Muda (waste)
Japanese for "waste": any work the customer does not pay for. The seven classic wastes are overproduction, waiting, transport, over-processing, inventory, motion and defects; most lists count unused employee talent as the eighth.
Multi-tenancy
One software installation serving several companies; each company's data is kept apart and one company cannot see another's records.

N

Near miss
An event that did not result in injury or damage but could have.
Nemawashi
Japanese for "preparing the roots": talking to everyone concerned one by one before the formal meeting to gather views and support for a decision.
Non-conformity
A requirement (standard, procedure, customer or legal requirement) not being met; it can be an audit finding, a defective product or a skipped check.

O

OEE (overall equipment effectiveness)
A measure of how much of the planned time a machine or line actually spends producing value; the product of availability, performance and quality rates.
Onboarding
The programme in which a new employee learns the workplace, rules, safety and their own job step by step in the first days; settling in, planned.
One Point Lesson (OPL)
Short training material that explains one topic on one page, mostly with visuals.
One-piece flow
Parts moving one at a time from station to station without waiting in batches; waiting, stock and the spread of defects fall.

P

PDCA cycle
Plan, do, check, act: the four-step cycle of improvement; also known as the Deming cycle.
Persistence tracking
Re-measuring months later whether a verified gain still holds; it exposes improvements that survived only on paper.
Poka-Yoke
A simple device or method that prevents a mistake or makes it visible the moment it happens; "mistake-proofing".
PPE (personal protective equipment)
Equipment worn by the worker to protect from a hazard: helmet, goggles, gloves, mask, harness; it is the last rung in the order of controls.
PPM (parts per million)
Defective parts expressed per million parts; it is used instead of percent because defect rates in sectors such as automotive are very small.
Preventive action
Work that removes the cause of a non-conformity that has not happened yet; unlike corrective action it does not wait for the problem to appear.
Pull system
Each step producing only what the next step has actually consumed; production does not start without a signal (Kanban).

R

Red tag
A tag attached in the sort step of 5S to material, tools or equipment whose need is unclear; it records what the item is, why it was tagged and the decision date.
Restore drill
Regularly trying whether a backup can really be restored; until it is restored, a backup is only a file.
Reward shop
The list where points earned by participation are exchanged for chosen rewards; part of gamification and kept separate from the reward the committee grants.
Risk assessment
Scoring a hazard or uncertainty by likelihood and severity and putting it in order of priority; risks and opportunities in ISO 9001 (clause 6.1), hazard-based risk in EHS.
Risk matrix
A table where likelihood and severity meet in rows and columns, giving each cell a risk level and colour; 5x5 is the most common form.
Risk-based thinking
The approach that came with the 2015 edition of ISO 9001: thinking ahead in every process about what could go wrong and which opportunity could be missed, and planning measures.
Root cause
The deepest cause of a problem, the one whose removal keeps the problem from coming back; removing the symptom does not count.
Root cause analysis (5 Whys)
Working down from the visible symptom of a problem to its real source; the 5 Whys method reaches the root cause by asking "why?" repeatedly.
RPO and RTO
The recovery point objective (RPO) says at most how many minutes of data may be lost in an outage; the recovery time objective (RTO) says how long the system takes to come back.

S

Safety data sheet (SDS)
A document that describes a chemical's hazards, safe use, protective equipment and emergency measures in sixteen sections; the supplier provides it.
Shift handover
Passing the notes, open topics and events of a finished shift to the incoming shift in writing and with approval; it puts on record what a verbal handover forgets.
Single sign-on (SSO)
A user signing in once with the company account and entering several applications without separate passwords; the company's identity provider verifies the identity.
SMED (quick changeover)
Single-Minute Exchange of Die: a method for shortening die or product changeover time; it splits changeover steps into internal (machine stopped) and external (machine running).
Spaghetti diagram
Drawing the path a person or material follows during a job as a line on the layout plan; it shows unnecessary walking and transport.
SQCD
Safety, quality, cost and delivery: the four headings of indicators in daily shop-floor management; some plants add people (P) or morale (M).
Standard work
Writing down the best currently known way of doing a job with its steps, sequence, time and checkpoints; the starting line for improvement.
Suggestion system
An arrangement in which employees submit ideas to improve the workplace in writing, the idea is evaluated and answered, and an implemented idea is recognised.
Supplier evaluation
Selecting, monitoring and periodically re-scoring the providers of bought-in products and services against written criteria. An on-site review of a supplier by the customer is called a second-party audit.

T

Takt time
The rhythm of customer demand: available production time divided by the number of units demanded; it says how many seconds apart each unit must come out.
TPM (total productive maintenance)
An approach in which operators, maintenance and management reduce machine losses together; autonomous maintenance (operators cleaning, inspecting and lubricating) and focused improvement are its main pillars.
Two-factor authentication
Asking for a second proof at sign-in besides the password: a one-time code on the phone, a hardware key or a passkey; a stolen password alone is not enough.

V

Value stream map (VSM)
A drawing that shows on one page the steps a product passes through from raw material to customer, with waiting times and information flow.
Verified savings
The gain from an improvement calculated by measurement rather than estimate and approved by finance; estimate, measurement and the approved amount are kept apart.
Visual management
Showing floor status, the standard and any deviation so they are understood at a glance; it works with colour, lines, boards and labels.

W

Waste hierarchy
The order of priority for dealing with waste: prevention, reduction, reuse, recycling, energy recovery and disposal last.
Webhook
Software sending a short notification to a set address on its own when an event happens (record closed, action overdue); telling instead of being polled.
Work instruction
A document that explains step by step how a job is done; each step states what to do, what to measure and which limit is accepted.
Work permit
A document that keeps hazardous work such as hot work, work at height or confined-space entry from starting until the set prerequisites are met and an authorised person approves.

Y

Yokoten (roll-out)
Japanese for "horizontal deployment": carrying an improvement that worked in one area to similar areas; learning by adapting, not copying.

Cookies