Skip to content
Let ideas be heard and improvements last.
Gemy

Lean Manufacturing and Continuous Improvement

From idea to standard work, on the floor

Suggestions, Kaizen and Kobetsu move on the same approval backbone; the committee scores blind and the reward decision is recorded. Findings from 5S audits, the Gemba board, Kamishibai, TPM and SMED land on the same action and evidence list; board indicators are calculated by the system.

  • Staff number and PIN, no e-mail needed
  • The committee scores blind
  • Board indicators calculated by the system
Sample company · demo dataProduction Gemba board: accident-free days, open actions, attendance and the monthly SQCD calendar
Gemba board, production

Gemba board, production

In short

Lean Manufacturing and Continuous Improvement brings 7 capabilities that are in the product today together on one record, approval and evidence backbone. Suggestions and Kaizen move on the same approval backbone and the committee scores them; a 5S audit is done from a phone with photos and a finding lands on the owner as an action with a due date. The Gemba board calculates its indicators from the system.

  • Employees sign in with a staff number and PIN; no e-mail needed
  • Committee members score without seeing each other's scores
  • An audit finding goes to the owner as an action with a due date
  • Board indicators are calculated by the system rather than written by hand
  • Kamishibai, SMED, TPM, shift handover and verified value are switched on by the company

Three roles, floor to management

The same record moves across three screens; each role sees its own step and the answer to its own question.

Shop-floor employee

Signs in from a phone or shared tablet with a staff number; adds the idea and a photo in three steps and sees the outcome.

OPEX / lean team

Runs SMED, Yamazumi, Kobetsu and TPM work on the same evidence backbone.

Shift supervisor

Hands over the shift and assigns team work from one screen; sees where things are stuck.

Whatever the source, one action list

An audit finding, a board action and a TPM abnormality tag land on the same action list, with owner, due date and evidence photo together. Without a connection, drafts wait on the phone and are sent when it returns; a sensitive record's draft is not written to the device, and the company switches on encrypted storage.

  • An audit finding becomes an action with a due date
  • Board indicators are calculated by the system
  • Finance verifies the gain (company enables), the work spreads to other areas
Sample company · demo dataMy actions screen: overdue and upcoming tasks; each row shows what to do and the due date
My actions screen

Capabilities

Capabilities in this discipline

The cards describe what the product does today; add-on modules are switched on by the company admin. Planned capabilities show only their name, with no description or date.

7 in the product, 7 switched on by the company, 3 on the roadmap

Improvement and suggestions

Where suggestions, Kaizen work and team projects are collected and evaluated.

  • Suggestions

    In the product

    A record type where employees write ideas on a form and the company's approval flow evaluates them.

    Module page
  • Kaizen

    In the product

    A record type for a completed improvement with its before and after state and its gain.

    Module page
  • Kobetsu

    In the product

    A project list where team projects targeting one loss are run step by step.

  • Committee and rewards

    In the product

    Evaluation where committee members score without seeing each other and rewards follow the company's bands.

  • Yokoten

    Company switches on

    Proposing a successful piece of work to another unit or site so they can apply it.

    This module is off in a new company; your administrator switches it on from the Features screen.

  • Kata and A3 coaching

    On the roadmap

Shop-floor management

Daily shop-floor meetings, workplace organisation audits and layered checks.

  • Gemba board

    In the product

    A digital board that shows a unit's indicators, problems and actions in the daily meeting.

    Module page
  • 5S

    In the product

    Workplace organisation programme: audits on the company's template, scores and stage tracking.

    Module page
  • Red tag

    In the product

    A record type for the red tag on unneeded material; the area owner decides what happens to it.

  • Kamishibai and layered audits

    Company switches on

    Short shop-floor audits with cards; each layer checks its own cards at its own frequency.

    This module is off in a new company; your administrator switches it on from the Features screen.

    Module page
  • Hands-free voice field mode

    On the roadmap

Productivity

Equipment effectiveness, time study and autonomous maintenance.

  • OEE

    Company switches on

    Equipment effectiveness calculated from shift records as availability times performance times quality.

    This module is off in a new company; your administrator switches it on from the Features screen.

  • Time study, SMED and Yamazumi

    Company switches on

    Work steps timed with a stopwatch, changeover analysis and a workload balancing chart.

    This module is off in a new company; your administrator switches it on from the Features screen.

  • TPM and Fuguai

    Company switches on

    Cleaning, inspection and lubrication rounds, plus Fuguai tags hung on equipment defects.

    This module is off in a new company; your administrator switches it on from the Features screen.

  • Andon

    On the roadmap

Standard work

Tools that write down how the work is done and how a shift is handed over.

  • Work instructions and one-point lessons

    Company switches on

    Step-by-step work instructions with measurement limits and photos, and short lessons on a single topic.

    This module is off in a new company; your administrator switches it on from the Features screen.

  • Shift handover

    Company switches on

    A handover record per unit, shift and day; the receiver confirms and open topics become tasks.

    This module is off in a new company; your administrator switches it on from the Features screen.

Floor plan is under Health, Safety, Environment and Sustainability.

Vehicles and fleet is under Equipment, Fleet and Supplier Operations.

Frequently asked questions

Can we build the suggestion form ourselves?

Yes. The company admin sets the fields, number of steps and approval flow. Ready-made templates have at most three steps; a longer form shows the admin a warning but is not blocked.

How does an employee without e-mail submit an idea?

They sign in with a staff number and a 6-digit PIN; in shared-tablet (kiosk) mode the session closes on its own. Voice typing is switched on by the company admin and works where the browser supports it.

Does it work where there is no connection?

Record drafts and photos wait on the phone and are sent when the connection returns. If the company switches on the field kit, they are stored encrypted and actions can be closed offline too. Approvals and audit completion are online; the whole app does not run offline.

Can the Gemba board be shown on a monitor?

Yes. The board's presentation view is landscape and light for a monitor or TV; indicators roll up through the board tree from cell to plant.

Stop writing the morning board by hand

Read the lean articles or plan a call around your own lines; let's move your first audit list together and let your floor team's effort show on the board.

Cookies

Essential cookies are needed for the site to work. Analytics cookies load only if you allow them; declining is as easy as accepting. You can change your choice at any time via the footer link.

Cookie policyPrivacy notice