A Kaizen (small, continuous improvement) record keeps the problem, the change and the before/after photos together; the gain is calculated line by line with its formula. Estimate, measurement and finance verification stay on separate cards; persistence is re-measured after completion, and the team's effort shows as a number.
The Kaizen module keeps a small improvement on one record with its problem, change and before/after photos. The gain is calculated line by line with its formula; estimate, measurement and finance verification stay on separate cards and are never added together. After completion, persistence is re-measured after a set period.
Before/after photos are taken from the same angle and go on record
Every gain item is calculated on its own line with its formula
Estimates and verified amounts are never added together
The submitter and the verifier are different people
Verified value and its parts (measurement, finance verification, retention, confidence score, FX adjustment) are switched on by the company
Built for three roles
Who sees what is the company's role setting; the record moves through three screens in the same order. At every step it shows who has it and when it was opened.
Team leader and operator
Opens the problem with a before photo; applies the change, adds the after photo and the measurement.
OPEX / lean team and committee
Reviews the gain lines, scores; proposes the working solution to similar areas.
Finance
Verifies the measured gain, not the estimate; cash, time and avoided cost stay on separate cards.
Setup in four steps
The company builds its own structure: record type, form fields, approval steps and who sees what are your settings.
01
Pick the record type
The ready-made "Kaizen" template comes with problem, change and result fields; before/after photos and gain lines are on the form. Add or remove fields.
02
Build approval and committee steps
Process-owner review, committee scoring and the reward decision are ordered; higher approval by amount uses the company's threshold.
03
Sustainment and verification
Set the follow-up period after completion and who re-measures. In value verification the submitter and the verifier are different people.
04
Switch on roll-out
If you wish, switch on Yokoten (roll-out): successful work goes to similar areas as a suggestion, each decides with a reason.
Inside the module
Before/after photos
The change is recorded with photos taken from the same angle; the committee scores with the evidence in view.
Line-by-line gain calculation
Every gain item on its own line with its formula. There is no single total; estimates and verified amounts are never added together.
Verified value
Estimate, measurement and finance check on separate cards; retention tracked. The company enables the module and parts such as measurement and retention.
Sustainment follow-up
Re-measurement after a set period following completion; the result stays on the record.
Committee and rewards
Agenda, scoring, decisions, minutes; the reward policy is a company setting.
Roll-out (Yokoten)
Good practice goes to similar areas as a suggestion; adoption shows on the plant matrix. Switched on by the company.
Yes. The company admin sets the fields, number of steps and approval flow. Ready-made templates have at most three steps; a longer form shows the admin a warning but is not blocked.
How does an employee without e-mail submit an idea?+
They sign in with a staff number and a 6-digit PIN; in shared-tablet (kiosk) mode the session closes on its own. Voice typing is switched on by the company admin and works where the browser supports it.
Close a Kaizen with photos and numbers
Read the Kaizen articles or see the module in a demo with your own gain items; let the team's effort show as a number.