Skip to content
Let ideas be heard and improvements last.
Gemy

Lean Manufacturing and Continuous Improvement

5S scores recorded with photos, findings become actions

The auditor answers the 5S (sort, set in order, shine, standardise, sustain) questions from a phone and takes photos; a non-conformity lands on the owner as an action with a due date, and closing needs the evidence the company defines. A finding points at the area rather than the person; red tags, the area's 5S stage and the score trend are followed on the same screen.

  • Audits and cards from a phone
  • A finding becomes an action with a due date
  • Board indicators calculated by the system
Sample company · demo data5S screen: area levels, latest audit scores and the target line
5S screen

5S screen

In short

The 5S audit module runs the audit from a phone with questions, a score and photos. A non-conformity lands on the owner as an action with a due date and closing needs the evidence the company defines; red tags, the area's 5S stage and the score trend are followed on the same screen. The company sets up the areas, questions and stages.

  • Questions, score and photos are recorded in the same audit
  • A non-conformity goes to the owner as an action with a due date
  • The evidence required to close is a company setting
  • Red tags are opened from the audit and closed on the list
  • Offline audit answers are switched on by the company; completion is online

Built for three roles

Who sees what is the company's role setting; the record moves through three screens in the same order. At every step it shows who has it and when it was opened.

Auditor and area owner

Answers the questions from a phone, takes photos; a finding lands on the owner as an action.

Production and shop-floor manager

Sees the stage of each area, the score trend and open actions; follows the red-tag list.

OPEX / lean team

Sets up audit questions and stages; uses good and bad examples in training.

Setup in four steps

The company builds its own structure: record type, form fields, approval steps and who sees what are your settings.

  1. 01

    Set up areas and questions

    Pick the areas to audit from the unit tree; write a short question list and scoring per area. The company defines the stages (passed and next).

  2. 02

    Plan the audits

    Who audits which area and how often: calendar and auditor assignment. The photo requirement is set per question.

  3. 03

    Connect the finding flow

    A non-conformity goes to the owner as an action: owner, due date and the evidence required to close (evidence rule) are company settings.

  4. 04

    Switch on offline answers

    For sites with a weak connection, the company admin switches on offline audit answers; completion is online.

Inside the module

Photo audits

Questions, score and photos in the same audit; a finding is recorded with location and time.

Staged progress

The area's 5S stage is visible: passed and next stage.

Red tags

Items to sort out are listed with red tags and closed.

Actions and evidence

A non-conformity goes to the owner as an action with a due date; closing needs the evidence the company defines.

Score trend

Audit result, non-conformities and actions per area; the trend on the board.

Offline audit answers

If the company switches this on, audit questions are answered in the field without a connection and wait in an encrypted vault; completion is online.

The module's screens

  • Sample company · demo data5S audit result: the score worked out line by line, level and target
    5S audit result

    Audit result screen

  • Sample company · demo dataTags: sorting cards such as red tags and their decision status
    Tags

    Red tag list

  • Sample company · demo dataAn area's 5S stage: stage scores and audit history
    An area's 5S stage

    The area's 5S stage

Frequently asked questions

Does it work where there is no connection?

Record drafts and photos wait on the phone and are sent when the connection returns. If the company switches on the field kit, they are stored encrypted and actions can be closed offline too. Approvals and audit completion are online; the whole app does not run offline.

Can the Gemba board be shown on a monitor?

Yes. The board's presentation view is landscape and light for a monitor or TV; indicators roll up through the board tree from cell to plant.

Leave the paper checklist behind

Read the 5S articles or see the module in a demo with your own areas.

Cookies

Essential cookies are needed for the site to work. Analytics cookies load only if you allow them; declining is as easy as accepting. You can change your choice at any time via the footer link.

Cookie policyPrivacy notice