Skip to content
Let ideas be heard and improvements last.
Gemy

Glossary

What is Value stream map (VSM)?

A short definition of Value stream map (VSM), how it is applied on the floor and where it lives in the product.

Short definition
Value stream map (VSM): A drawing that shows on one page the steps a product passes through from raw material to customer, with waiting times and information flow.
Also known as
VSM

How is it applied?

The team draws the flow by walking the floor; cycle time, waiting and stock are written for each step, and value-adding time is compared with total time. A future-state map and an improvement plan come out of the current-state map. Fictional example: a team maps a product's flow and sees that parts spend far more time waiting in buffers than being processed. The future-state map targets those buffers. A value stream map is often confused with a process flowchart. A flowchart shows the order of steps; a value stream map also shows time, stock and information flow.

In the product

The product has no map drawing tool: step times are measured with a stopwatch in the time study (switched on by the company), and improvements from the map are opened as Kaizen or Kobetsu records with their actions on the one list.

Cookies

Essential cookies are needed for the site to work. Analytics cookies load only if you allow them; declining is as easy as accepting. You can change your choice at any time via the footer link.

Cookie policyPrivacy notice