A short definition of Control plan, how it is applied on the floor and where it lives in the product.

Short definition
Control plan: A document that states what is checked at each production step, how, how often and within which limits; it follows on from the FMEA.

How is it applied?

A checkpoint is set for failure modes that scored high in the FMEA; the measuring device, sample size and what to do when out of limits are written. The plan is updated when the process changes. Fictional example: if lack of weld penetration scored high in the FMEA, the plan calls for a cross-section check on each shift's first part. A control plan is often confused with a work instruction. The control plan lists what is checked across the whole process; the instruction shows the operator how to do the check.

In the product

In the product the control plan is a table of the FMEA study: characteristic, specification, method, sampling frequency, reaction plan and owner are written row by row. A row can be linked to an FMEA row; if the plan changes on an approved study, the study shows as "changed after approval".