What is Hoshin Kanri?

A short definition of Hoshin Kanri, how it is applied on the floor and where it lives in the product.

Short definition
Hoshin Kanri: A policy deployment method that links long-term goals to annual goals, improvement projects and indicators; usually shown in an X-matrix.

How is it applied?

Goals cascade top-down, projects are proposed bottom-up; each month indicators are compared with targets (Bowling chart) and deviations get a measure. Do not send the target down as a number alone. Each level proposes its contribution and refines it with the level above; this is called catchball. Fictional example: the plant sets a scrap target and a line team links it to a changeover improvement. Hoshin is often confused with the annual budget: the budget allocates resources, Hoshin links goals to projects and indicators.

In the product

In the product long-term and annual goals, projects and indicators are linked in an X-matrix; there is a 12-month Bowling chart and a landscape A3 PDF. Switched on by the company.