Skip to content
Let ideas be heard and improvements last.
Gemy

Glossary

What is Estimated savings?

A short definition of Estimated savings, how it is applied on the floor and where it lives in the product.

Short definition
Estimated savings: Calculating the gain an improvement is expected to bring before it is implemented; it is never confused with verified savings or added to them.

How is it applied?

In the Kaizen application the estimate is written item by item (material, time, energy, avoided cost); the committee sets priority by it. After implementation a measurement is made and estimate and measurement are reported side by side; the gap is a learning topic.

In the product

In the product the estimate sits on its own card: the line-by-line gain calculation on the Kaizen record is entered as an estimate, measurement and finance verification go on separate cards and the three are never totalled; reports show cash, time and avoided cost on three separate cards. Measurement, finance verification and the three report cards come with the verified value module; the company switches on the module and its measurement and finance verification parts one by one.

Cookies

Essential cookies are needed for the site to work. Analytics cookies load only if you allow them; declining is as easy as accepting. You can change your choice at any time via the footer link.

Cookie policyPrivacy notice