Field guide

8D field guide: the first meeting

Preparing the first 8D meeting, the agenda and what should come out of it.

Level:
Practitioner
Who it is for:
Quality engineer

Preparation

  • Gather the complaint or non-conformity record and a sample part.
  • Invite the people who know the problem and the person who will decide.
  • Print the 5 Whys and fishbone templates.

Steps

  1. Write the problem together

    Answer what, where, when and how much together in the meeting.

  2. Agree the containment

    Decide the action that protects the customer today, its owner and its check.

  3. List the causes

    Write possible causes on the fishbone; pick who will collect evidence for each.

  4. Date the next step

    Put the meeting where verification results will be discussed in the calendar.

Output

At the end of the meeting you have a measurable problem description and a containment action with an owner. You also have a list of causes to collect evidence for.

Templates

  • 8D report

    Every template comes in three levels and three formats: Basic is a one-page blank form; Detailed adds guidance and an example row; Complete adds a guide, a filled-in example and a checklist.

    The template files are in Turkish.

  • 5 Whys worksheet

    Every template comes in three levels and three formats: Basic is a one-page blank form; Detailed adds guidance and an example row; Complete adds a guide, a filled-in example and a checklist.

    The template files are in Turkish.

  • Fishbone diagram

    Every template comes in three levels and three formats: Basic is a one-page blank form; Detailed adds guidance and an example row; Complete adds a guide, a filled-in example and a checklist.

    The template files are in Turkish.

Back to the topic

Sources

  1. EA23-002 Attachment, Request 16: Global 8D (G8D) disciplines D0–D8 (Ford Motor Company response). Opens in a new tab (PDF), U.S. National Highway Traffic Safety Administration (NHTSA) (accessed 15 November 2026)
  2. 5 Whys, Lean Enterprise Institute (accessed 15 November 2026)

Cookies

Essential cookies are needed for the site to work. Analytics cookies load only if you allow them; declining is as easy as accepting. You can change your choice at any time via the footer link.

Cookie policyPrivacy notice