Skip to content
Let ideas be heard and improvements last.
Gemy

The 8 wastes in lean manufacturing: how to see them on the floor

In brief

From waiting to overproduction, from unnecessary motion to unused talent. The eight wastes with examples and how to measure them.

1 October 2026 · 1 min read

Sample company · demo dataYamazumi chart: station loads and the takt line
Yamazumi chart

Lean thinking starts by treating any work the customer would not pay for as waste. Reducing waste usually takes attention, not investment.

The eight wastes

  • Overproduction: making too much or too early.
  • Waiting: stopping for material, approval or a machine.
  • Transport: moving material more than needed.
  • Over-processing: precision or steps the customer did not ask for.
  • Inventory: piles of WIP and finished goods that hide flow.
  • Motion: searching, reaching, walking.
  • Defects: scrap, rework, complaints.
  • Unused talent: not asking employees for their ideas.

Measure to see

Waste shrinks only once it is visible. A time study splits an operation's steps into value-adding, necessary non-value-adding and waste. A Yamazumi chart stacks these steps per operator; the station above takt time stands out at once.

Sample company · demo dataStopwatch step timing: value-adding and waste steps
Stopwatch step timing

The eighth waste, unused talent, is the reason suggestion and Kaizen systems exist: the person who does the job every day sees the other seven best.

You may copy and share this article with attribution (Gemy, https://www.gemydigital.com/en/blog/yalin-uretimde-8-israf).

Related posts

Cookies

Essential cookies are needed for the site to work. Analytics cookies load only if you allow them; declining is as easy as accepting. You can change your choice at any time via the footer link.

Cookie policyPrivacy notice