The Lean Enterprise Institute lexicon defines takt time as how often one product must be produced to meet customer demand: the available working time divided by the demand in that period. The operator balance chart in the same lexicon (also known as Yamazumi, Japanese for “stacking up”) is the tool that stacks each operator's work steps by duration and shows takt time as a horizontal line. In Toyota's account of its production system, this pace is the basis of just-in-time: neither fast nor slow, but at the customer's pace.
Calculating takt
Available time: planned breaks and planned stops are subtracted from the shift. Breakdowns and waiting are not subtracted; they are losses, not takt.
Demand: the quantity the customer wants in the same period.
Takt: available time divided by demand. The result is the time allowed for one piece.
A fictional example: with seven hours of available time in a shift and a demand of 420 pieces, takt is one minute. Every station must finish one piece in under a minute; when takt changes (demand rises or the shift shortens), the whole balance is redone.
Reading the chart
Each column is a station or an operator; the column's height is the total duration of the steps at that station.
A column above the takt line is the bottleneck: the line runs at that station's pace and the others wait.
A column far below the takt line is idle capacity: the operator waits or overproduces.
Colours inside the column tell the nature of the step: value-adding, necessary but non-value-adding, waste. Balancing reduces the red, the waste, first.
The balancing sequence
Waste steps are removed first: walking, searching, waiting, unnecessary transport. Columns shorten without moving a single step.
Then the necessary but non-value-adding steps are shortened: fixtures, layout, material presentation.
The remaining work is distributed across stations close to takt; every column stays a little below the takt line.
A step is moved to relieve the bottleneck station, but the moved step must not push the receiving station above takt.
The new distribution is written into standardised work; an unwritten balance breaks at the first shift change.
Explaining it to the operator
Balancing is easy on paper and delicate on the floor, because moving a step means changing an operator's job. The chart makes that conversation easier: operators see their own column, usually say themselves which step is waste and know before the engineer where a step makes sense to move. A time study measures the work, not the operator; if that distinction is not stated plainly at the start, the work slows down or speeds up during measurement and the data is spoiled. A good balance evens out the operators' load and forces nobody to work faster.
Common mistakes
Confusing takt with cycle time: takt is the customer's pace, cycle time is the station's pace. The aim is to keep cycle time below takt.
Not redoing the balance when takt changes: a chart from three months ago does not match today's demand.
Moving steps without removing waste: the waste only changes place.
Bringing a column exactly to the takt line: a station with no margin becomes the bottleneck at the smallest deviation.
A fictional example
On a four-station assembly line takt was sixty seconds. The time study gave these columns: station one forty-five, station two seventy-two, station three fifty, station four thirty-eight seconds. Station two was the bottleneck and the line actually delivered a piece every seventy-two seconds. The team looked at station two's column first: ten seconds of walking to the parts bin and six seconds of searching for labels. The bin was brought to the station and the labels were arranged on an ordered shelf; the column dropped to fifty-six seconds. Then two small steps were moved to station four and every column settled between fifty and fifty-six seconds. The line now ran within takt and no operator worked faster than before; they simply no longer walked or searched. The new distribution was written into standardised work, and at the next takt change the team started again from the same chart.
Sample company · demo data
Stopwatch step timing
How it is done in Gemy
On the time study screen each step is timed with a stopwatch; steps are marked as value-adding, necessary or waste.
Measured steps flow into the Yamazumi chart automatically; takt is drawn as a horizontal line and a station above the line is visible on the chart.
When a step is moved to another station the chart is redrawn; the change can be documented with a Kaizen record.
From an applied time study a three-step wizard produces a work instruction draft; the draft is published through the normal instruction flow.
The target time is not a performance score; people are not ranked.
Time study and Yamazumi are a module the company switches on if it wishes; no durations are taken automatically from machines or a production system.
In short
Takt time is the customer's pace: available time divided by demand. Yamazumi stacks each station's load against that pace; a column above the line is the bottleneck, a column far below it is idle capacity. Balancing removes waste first, then distributes the remaining work a little below the takt line and writes the result into standardised work. A time study measures the work, not the operator; a good balance evens the load without forcing the pace.
You may copy and share this article with attribution (Gemy, https://www.gemydigital.com/en/blog/yamazumi-ve-hat-dengeleme-takt-suresine-gore-is-dagilimi).
Autonomous maintenance means the person who knows the machine best, the operator, takes over its daily care. The content of the first three steps, the abnormality tag, the CIL standard and the division of work between operator and maintenance.
Kamishibai checks with short cards, at regular intervals, whether a standard is being followed on the floor. The structure of a card, the layers, good and bad question examples and the path of a red card.
5 Whys follows a single chain of a problem that has already happened; FMEA looks for failures that have not yet happened at the start of a design or process. When to use which, and where the two meet.
7 November 2026 · 5 min
Cookies
Essential cookies are needed for the site to work. Analytics cookies load only if you allow them; declining is as easy as accepting. You can change your choice at any time via the footer link.