How to do a shift handover: checklist and common mistakes
In brief
Shift handover is the ten minutes in which the most information is lost. HSE's three elements, a checklist for the outgoing and the incoming person, the written record and the five most common mistakes on the floor.
6 November 2026 · 5 min read
Sample company · demo dataMy work screen
The UK Health and Safety Executive (HSE) treats shift handover as a high-risk moment from a human factors point of view and describes a good handover in three elements: preparation by the outgoing person, a two-way exchange of information and the incoming person checking what they received. HSE's page on safety-critical communications also advises against leaving important information to a single channel and recommends backing a verbal handover with a written record. A handover is not what the outgoing shift said but what the incoming shift understood.
On the same page HSE gives two examples of handover communication failures: the 1983 Sellafield beach incident, where highly radioactive waste liquor was discharged to sea after a communication failure between shifts, and the Piper Alpha disaster. The Cullen Report on Piper Alpha named failed information transfer at handover as one of many contributing factors. HSE notes that most such accidents involved planned maintenance work; if a maintenance job is half done when the shift changes, it is the first line of the handover note.
Checklist for the outgoing person
The handover is prepared in the last half hour of the shift, not the last five minutes. While writing the note, the outgoing person answers these questions.
Safety: any open permit, isolated energy, disabled guard or confined space job?
Machines and equipment: which machine is running abnormally, which has stopped, which fault was reported to maintenance?
Quality: any suspect batch on hold, quarantine, out-of-limit measurement?
Production: status against plan; unfinished work and why.
Open issues: everything unresolved, one line each, with a suggested owner.
People: absences, newcomers, training in progress.
Checklist for the incoming person
I read the note and asked about every line I did not understand.
I saw the open permits and isolations in place.
I checked the abnormally running machine myself.
I took the open issues onto my own list or handed them to an owner.
I approved the handover; from the approval on, the responsibility is mine.
The form of the handover
A good handover is face to face, two-way, verbal and written together. The written record does not replace the spoken handover, and the spoken handover does not replace the record. The record has a simple structure: unit, shift, day; a general note; open issues line by line; the events of that shift. A handover record contains no names, injury details or measured values; those stay in their own records and the handover only points to them.
Common mistakes
The handover is done in the corridor, standing; the incoming person starts work without reading the note.
Only problems are described; a machine running abnormally but not yet causing trouble is not mentioned.
An open issue is passed to the next shift and then the next; nobody owns it and it disappears after three days.
The handover note contains only production counts; the safety and quality lines stay empty.
A shift or unit that stops entering data goes unnoticed; silence is taken for normal.
From handover to work
A handover record is not a diary but a source of work. After the handover, every open issue must be tied to an owner and a due date; otherwise it is rewritten every shift and never solved. A handover record carrying the same line for three shifts in a row says that the issue is no longer a handover matter but an action or a Kaizen.
A fictional example
On an extrusion line the night shift noticed that the cooling pump was running louder than normal; the pump had not stopped and production continued. The handover was done in the corridor and the noise was not mentioned, because “there was no problem”. In the third hour of the morning shift the pump stopped and the line waited four hours. In the incident investigation nobody blamed anybody; the handover routine was changed. A line for “equipment running abnormally but not stopped” was added to the outgoing checklist, the handover moved to the head of the line, and the incoming person did not approve without seeing that line in place. The next month the same pump made the noise again; this time maintenance knew before the shift ended.
Sample company · demo dataManager home
How it is done in Gemy
There is one handover record per unit, shift and day: draft, sent, approved. A night shift is recorded on the day it starts.
The outgoing person writes the note and the open issues line by line. A sent record does not change; the person who wrote it cannot approve it.
The shift's events are collected automatically: a vehicle out of service, a work instruction step out of limits, a red tag, an OHS event, an expiring work permit. A line appears only if the related module is on and the person can see that record.
After sending, every open issue or event is turned into an action with one button; the owner is found by the unit manager rule.
Silence radar: if a unit that used to enter data regularly has entered nothing in the last working days, the responsible person is notified once. Holidays are not counted.
It does not verify the incoming person against the shift plan, a sent record cannot be withdrawn and there is no PDF of the handover record. Injury details, measured values and personal names are not written into handover lines. Shift handover is a module the company switches on if it wishes. The record does not replace the face-to-face conversation; it documents when and with what the conversation ended.
In short
A shift handover is made of the outgoing person's preparation, a two-way conversation and the incoming person's check; face to face, verbal and written together. Two checklists standardise it: the outgoing person writes safety, machines, quality, production and open issues; the incoming person reads, asks, sees in place and approves. The most common mistakes are the corridor handover and the ownerless open issue. An issue carried for three shifts is no longer a handover matter but an action.
You may copy and share this article with attribution (Gemy, https://www.gemydigital.com/en/blog/vardiya-devir-teslimi-nasil-yapilir-kontrol-listesi-ve-sik-hatalar).
Every solved problem is a piece of knowledge; in most companies it leaves with the person who solved it. The four places where knowledge is lost, the view of ISO 30401 and ISO 9001, and five habits that make knowledge independent of people.
A supplier audit is a process, not a visit: which supplier, which question, which finding, which evidence. The audit principles of ISO 19011, the structure of the question list, finding classes and how the reply returns to the same record.
Document control ensures the right version of the right document is with the right person. What ISO 9001 asks for, document types and numbering, the approval chain, distribution and reading, withdrawing the old version and the five most common gaps.
9 November 2026 · 6 min
Cookies
Essential cookies are needed for the site to work. Analytics cookies load only if you allow them; declining is as easy as accepting. You can change your choice at any time via the footer link.