Gemba is the real place where work happens. The purpose of the walk is to see and listen, not to inspect. Preparation, questions, what to avoid and follow-up.
19 October 2026 · 4 min read
Sample company · demo dataGemba board, production
In the Lean Enterprise Institute lexicon, Gemba means “the actual place”: where value is created. A Gemba walk is the management practice of grasping the situation through direct observation and inquiry rather than from reports. An indicator read at a desk is no substitute for five minutes of reality on the floor.
A walk is not an inspection
To an employee, a manager coming to the floor can mean two things: “looking for something” or “coming to understand us”. The first three sentences decide which. The aim of the walk is to see the process, not the person; to find what makes the job hard, not to find a mistake. The respect-for-people pillar of the Toyota Way becomes concrete here: the person doing the job is the expert, and the manager comes to learn.
Before the walk
Pick one theme: safety, quality, flow or an improvement promised last week.
Look at the board: where are the red days, who holds the open actions?
Tell the team leader; this is a joint look, not a raid.
Bring a notebook, not a solution book.
Questions to ask on the floor
“How do you do this job?” While explaining, they see the gap from the standard themselves.
“What makes it hardest for you?” The answer usually points to a waste: waiting, searching, carrying.
“What happened to the issue you raised last week?” A question nobody follows up is never answered again.
“Is there an easier way to do this?” This is where ideas are born.
What to avoid
Dictating a fix on the spot, correcting a person in front of colleagues, taking notes and never coming back, and choosing a different theme every walk all waste the walk. Naming a good practice when you see one is also part of the walk; a manager who only looks for problems soon becomes a manager who is only shown problems.
After the walk
Issues raised during the walk should be tied to an owner and a date the same day. The first question on the next walk is whether last time's promise was kept. A walk without follow-up confirms, in the employee's eyes, that “nothing happened”.
A weekly rhythm
A Gemba walk is a habit, not an event. If the team leader looks at the same area every day, the area manager once a week and the plant manager once a month, the floor reads it as interest rather than inspection. Each layer asks its own question: the team leader about today's work, the area manager about this week's standard, the plant manager about whether last month's improvement is still in place. A walk should not exceed twenty minutes; a long walk turns into a meeting, and a meeting turns into a desk. A walk that is not in the calendar is skipped in the first busy week, so the walk should sit in the manager's calendar as firmly as any other meeting.
What does the employee feel?
The success of a walk is decided not by the manager's notes but by what the employee feels the next day. An employee who was listened to, whose question was taken seriously and who saw what they said tied to an owner tells more on the next walk. An employee who was questioned, corrected and never heard back says “everything is fine” on the next walk. The difference between those two sentences is respect for people as it shows on the floor.
Sample company · demo dataGemba board presentation view
How it is done in Gemy
The Gemba board is the digital counterpart of the meeting board: SQCD calendars are green or red each day; the top card shows accident-free days, open actions (late ones in red) and today's attendance. The “How was it calculated?” note under accident-free days and attendance is written with real dates.
An issue from the walk is opened as an action from the board; it lands in the owner's My work list, turns red as “Late” after its due date and triggers a reminder.
Cell boards roll up into area boards and area boards into the plant board; a manager can drill down to the source.
A landscape presentation view is available for a monitor; the board can also be downloaded as a PDF.
The board does not do the walk; it shows what to look at during the walk and what happened afterwards.
In short
A Gemba walk is a manager learning where the work is done and from the person doing it. One theme, a few open questions, a notebook and follow-up are enough. Dictating the fix, correcting a person in front of colleagues and never coming back waste the walk. The measure of a walk is not the manager's notes but whether the employee tells more or less the next day. If every layer looks at the same area at its own rhythm, the floor reads it as interest; then problems are not hidden but spoken, and a spoken problem is a solvable one.
Takt time is the customer's pace; Yamazumi stacks each station's load against that pace. Calculating takt, reading the chart, the balancing sequence and how to explain balancing to the operator.
Autonomous maintenance means the person who knows the machine best, the operator, takes over its daily care. The content of the first three steps, the abnormality tag, the CIL standard and the division of work between operator and maintenance.
Kamishibai checks with short cards, at regular intervals, whether a standard is being followed on the floor. The structure of a card, the layers, good and bad question examples and the path of a red card.
7 November 2026 · 5 min
Cookies
Essential cookies are needed for the site to work. Analytics cookies load only if you allow them; declining is as easy as accepting. You can change your choice at any time via the footer link.