Standardised work: the starting line of improvement
In brief
Without a standard, improvement cannot be measured; what cannot be measured cannot be kept. The three elements of standardised work, how it protects rather than restricts the employee, and how to keep it alive.
18 October 2026 · 4 min read
Sample company · demo data
Stopwatch step timing
The Lean Enterprise Institute defines standardised work as the current best method for each operator's job, resting on three elements: takt time, work sequence and standard in-process stock. The same lexicon calls standardised work the object of Kaizen: the thing to be improved is the standard. A job without a standard cannot be improved, because nobody can tell what changed.
A standard protects rather than restricts
On the floor, standardised work is often heard as “they are dictating how we work”. A well-written standard does the opposite: it records the safest and easiest way known today, teaches the same way to a new colleague and, when something goes wrong, looks for the fault in the method rather than the person. The person who writes the standard should be the person doing the job; the engineer's role is not to write it but to measure it together and make it official.
Takt time: the customer's pace; how long one piece may take.
Work sequence: the safest and shortest order of steps; which are done by hand and which by machine.
Standard stock: the minimum number of pieces at the station so that flow does not stop.
A standard is a living document
A standard is not a sheet pinned to the wall and forgotten. In the PDCA cycle the “act” step is writing the change that worked into the standard; otherwise the gain melts within weeks. When a standard changes, the old version must be kept, the new one read, and the reading known. The manager follows the standard not to punish deviations but to learn whether the standard works: if it cannot be followed, the problem is usually in the standard.
Toyota's production system page says the system was built by daily improvements; every one of them is a new version of a standard. Without a starting line, the distance travelled cannot be measured.
How to write a standard
Write it with the person doing the job, at the job; a standard written at a desk does not hold on the floor.
Measure every step: time, distance, hand changes. An unmeasured step is argued about, a measured one is discussed.
Write safety and quality points inside the step, not in a separate list.
Show it with photos: the right grip, the right placement. Text explains the picture.
Add a version and a date; do not throw away the old version, it is the starting line of the next improvement.
Deviation from the standard is a finding, not an offence
A manager who sees the standard not being followed has two options: warn the person or ask why. The first gets the standard followed once more; the second improves the standard. Most of the time an employee abandons the standard not knowingly but because it did not work that day: the material came in differently, the fixture was broken, takt changed. This information surfaces only when asked for. A company that records the deviation as a finding and investigates its cause brings the standard a little closer to reality every month.
Sample company · demo dataTime study
How it is done in Gemy
On the time study screen each step is timed with a stopwatch; value-adding, necessary and waste steps are separated. Measured steps flow into the Yamazumi chart and are compared with the takt line.
From an applied time study a three-step wizard produces a work instruction draft; the result is only a draft and publication goes through the normal instruction flow.
An instruction is made of steps; a step can ask for a measured value and a photo. A published instruction does not change; a change is a new version and old runs stay with the old version.
Every run leaves a permanent record of who, when, which version and which values. The target time is not a performance score; people are not ranked.
Kamishibai cards check at regular intervals whether the standard is followed on the floor; a red card cannot be closed without an action.
Time study, work instructions and Kamishibai are modules the company switches on if it wishes; they do not replace training or risk assessment.
In short
Standardised work is the written form of the best method known today and the starting line of improvement. Takt time, work sequence and standard stock are its three elements. A standard is written to protect the employee, not to restrict them, which is why its author is the person doing the job. A deviation is a finding rather than an offence, and most of the time it corrects the standard itself. The manager's job is not to pin the standard to the wall but to ask whether it works on the floor and to write every change that works as a new version. A race without a starting line has no measurable distance.
Takt time is the customer's pace; Yamazumi stacks each station's load against that pace. Calculating takt, reading the chart, the balancing sequence and how to explain balancing to the operator.
Autonomous maintenance means the person who knows the machine best, the operator, takes over its daily care. The content of the first three steps, the abnormality tag, the CIL standard and the division of work between operator and maintenance.
Kamishibai checks with short cards, at regular intervals, whether a standard is being followed on the floor. The structure of a card, the layers, good and bad question examples and the path of a red card.