Skip to content
Let ideas be heard and improvements last.
Gemy

Work instructions: step-by-step work, measurements that stop out of range, and instructions from time studies

In brief

The instruction an operator follows does not move on when a measured value is out of range. A time study becomes an instruction draft in one click, and every run is recorded with who, when and which values.

27 October 2026 · 2 min read

Sample company · demo dataTime study (SMED): current and target downtime, time gain and external time
Time study

Standardized work is the written method that lets an operator do a job the best way known today, the same way every time. Lean literature gives it three foundations: a takt time worked out from customer demand, the order of the steps, and the smallest buffer of parts needed to keep the flow going (the LEI lexicon in the sources has the full definition). Türkiye's Law No. 6331 also requires training especially when starting work, when equipment changes and when new technology arrives (article 17). A paper instruction states these things but does not show whether they were done.

How does an instruction work?

  • An instruction is made of steps. A step can ask for a measured value; the company sets the lower and upper limit.
  • In “Control” mode a step cannot be passed with an out-of-range value. In “Warn” mode the operator can continue but the step counts as failed; the company can require a note in this case. The server applies the same rule again.
  • A step can require a photo. Every run leaves a permanent record of who ran it, when, on which version and with which values.
  • A published instruction does not change; a change is a new version, and old runs stay with the old version.
  • An action can be opened from a failed run in one tap; if the instruction is linked to a device and autonomous maintenance is on, a defect (Fuguai) tag can be opened too.
  • An A4 card for the machine is available as a PDF: QR code, version, limits and the unit's personal protective equipment strip.
Sample company · demo dataStopwatch step timing: value-adding and waste steps
Stopwatch step timing

From time study to instruction

The steps of an implemented time study are not retyped. An authorised person creates an instruction draft from the study page with a three-step wizard (name and code, unit, preview). Parallel steps merge into one, removed steps are dropped, and steps with a target time keep it. The preview states clearly what did not carry over. The result is only a draft; publishing goes through the normal instruction flow.

If the company also switches on the field kit, an instruction run works offline; when the connection returns, photos are sent first, then the record.

What it does not do

An instruction does not replace training or the OHS risk assessment. The target time is not a performance score; people are not ranked. Work instructions is a module the company switches on if it needs it.

Sources

You may copy and share this article with attribution (Gemy, https://www.gemydigital.com/en/blog/is-talimati-ve-etutten-talimat).

Related posts

Cookies

Essential cookies are needed for the site to work. Analytics cookies load only if you allow them; declining is as easy as accepting. You can change your choice at any time via the footer link.

Cookie policyPrivacy notice