Visual management and Andon: making the problem visible
In brief
The worker who pulls the Andon cord stops the line and is thanked for it. Visual management means building a workplace where problems are not hidden. The logic of Andon and how boards carry it.
21 October 2026 · 4 min read
Sample company · demo dataGemba board presentation view
The Lean Enterprise Institute lexicon defines visual management as placing tools and indicators in plain view so that the status of the system is understood at a glance. Andon is a visual signal of an abnormality: a lamp, a board, a sound. On Toyota's production system page Andon is part of jidoka: when an abnormality occurs, work stops, the problem becomes visible at that moment and a defective product does not move on.
The real message of Andon
The technical side of Andon is simple; the cultural side is the hard part. The worker who pulls the cord stops the line, which slows production. Building a workplace where this is not punished but expected is the manager's job. The team leader runs to the cord; the first question is not “why did you stop?” but “what did you see?” The person who makes a problem visible is not its source but the start of its solution.
A hidden problem grows; a visible one shrinks.
The signal points at the process, not the person.
Response time to the signal is the measure of the culture: a lamp that nobody answers soon stops being pulled.
Everyday forms of visual management
Visual management is not only a lamp. A calendar full of green and red days, a chart with a target line, an audit board showing a red card, the empty shadow of a tool that is not in its place; all serve the same principle: normal and abnormal are distinguishable at the same instant by everyone who looks. The test of good visual management is whether a visitor can understand the situation without an explanation.
The manager's job
Every problem made visible waits for an answer. If a red day is not explained and a red card does not become an action, the board turns into decoration within weeks. The manager has to look at the board every day, read red as a question and look for the answer with the people on the floor. The board is not for the manager to watch the floor but for the floor to see the manager.
How long does pulling the cord take?
In the system Toyota describes, the operator pulls the cord on seeing an abnormality; the team leader comes, and if the problem can be solved within takt the line continues without stopping, otherwise the line stops. What matters here is not that the line stops but that stopping is not a disgrace. An operator afraid to pull the cord passes the defective part to the next station; the defect grows there and may reach the customer. A line stopped early is cheap; a defect found late is expensive.
How to set up visual management
Define a normal: for every indicator, what “good” means should be written and visible.
Make it distinguishable at a glance: colour, position and shape; no reading required.
Keep it on the floor: a screen in the office does not replace a board on the floor.
Give red an owner: for every abnormal state, write who closes it and by when.
Let the people doing the work update the board; a board is a tool for conversation, not for reporting.
Sample company · demo dataKamishibai board
How it is done in Gemy
On the Gemba board SQCD calendars are marked green or red each day; late actions show in red on the top card. Indicators are entered by hand or come from the system.
Kamishibai, work instructions and the Bowling Chart are modules the company switches on if it wishes. A Kamishibai audit has two colours: a green card if every item complies, a red card if even one does not. A red card cannot be closed without an action; when the action closes, the board cell says “Action closed” and that card is drawn first in the next audit.
In a work instruction, if a step's measured value is outside its limits, in “Check” mode the step cannot be passed; in “Warning” mode work continues but the step counts as failed. An action is opened from a failed run with one button.
The Bowling Chart shows each annual goal month by month as on target, in warning or off target; a month without data is not counted as zero.
A landscape presentation view is available for a monitor.
Gemy does not provide a physical Andon light or a machine connection; what it makes visible are records, audits and indicators. A person still pulls the cord.
In short
Visual management means building a workplace where everyone can tell normal from abnormal at the same moment; Andon is its best-known form. The worker who pulls the cord stops the defect, not production, and should be thanked for it. Without an owner and a closing date for red, the board turns into decoration. The manager's job is to look at the board every day, read red as a question and look for the answer together with the people doing the work. The person who makes a problem visible is not its source but the start of its solution.
Takt time is the customer's pace; Yamazumi stacks each station's load against that pace. Calculating takt, reading the chart, the balancing sequence and how to explain balancing to the operator.
Autonomous maintenance means the person who knows the machine best, the operator, takes over its daily care. The content of the first three steps, the abnormality tag, the CIL standard and the division of work between operator and maintenance.
Kamishibai checks with short cards, at regular intervals, whether a standard is being followed on the floor. The structure of a card, the layers, good and bad question examples and the path of a red card.
7 November 2026 · 5 min
Cookies
Essential cookies are needed for the site to work. Analytics cookies load only if you allow them; declining is as easy as accepting. You can change your choice at any time via the footer link.