How to set up a Gemba board: SQCD indicators and the daily meeting

In brief

The Gemba board is where the team looks at the same four questions every morning: safety, quality, delivery, cost. Choosing indicators, laying out the board, running the ten-minute meeting and the habits that kill a board.

5 November 2026 · 5 min read

Sample company · demo dataProduction Gemba board: accident-free days, open actions, attendance and the monthly SQCD calendar
Gemba board, production

The Lean Enterprise Institute lexicon defines visual management as an arrangement that makes the status of a process understandable at a glance. The Gemba board is the team-level form of that arrangement: a board standing next to where the work is done, showing yesterday's result and today's problem. Four letters form the backbone of most boards: S for safety, Q for quality, C for cost, D for delivery. Some companies add P for people or M for morale; what matters is not the number of letters but a real measurement behind each one.

Choosing indicators

  • Measure what the team can influence: line stoppages, first-time-right rate, number of near misses. A number the team cannot touch only takes up space.
  • Readable daily: a number that arrives monthly cannot be green or red on a board.
  • A known source: who writes the number, from where and when.
  • Every indicator has a target and a “what we do if it is red” rule.

Laying out the board

A good board tells a story from left to right: at the top the calendars of the four indicators (green or red each day), in the middle the reasons for red days, at the bottom the open actions and who is holding them. The jidoka principle in Toyota's description of its production system rests on making the abnormality visible and stopping; the board is the team-level application of that principle. A problem is not hidden, it is written.

  • Calendars: month view; one colour per day. A grey box means “no data entered” and is itself a problem.
  • Reasons for red: short, factual, no names. “Press 2 stopped, die sensor” is enough.
  • Actions: owner, due date, status. An overdue action stays visible on the board.
  • Ideas and thanks: suggestions from the team and implemented Kaizens also have a place on the board.

The flow of the daily meeting

The meeting takes no more than ten minutes, is held standing and follows the same order. If the order changes, the meeting drifts; if it runs long, it turns into a problem-solving session and loses its real purpose, the quick look.

  • Safety: any incident or near miss yesterday; any permitted job today?
  • Quality: how many defects yesterday, which station; what to watch today?
  • Delivery: plan versus actual; today's plan and its risk?
  • Cost: stoppages, scrap, overtime; the items the team can influence.
  • Actions: were yesterday's promises kept; who does what today?

Habits that kill a board

What kills a board is not missing data but missing answers. If the reason for a red day is written but no action is opened, the team stops writing reasons in the second week. If the manager “corrects” an indicator in front of the team, the board turns permanently green and says nothing. The third habit is the team leader filling the board alone; the board belongs to the team and everyone takes the pen in turn. The fourth is the senior manager visiting the board only to inspect; when the senior manager comes to inspect, the team decorates the board; when they come to ask, the team trusts it.

A fictional example

In an assembly cell the board had been green for three months and the meeting took two minutes. One morning the department manager joined and asked a single question: “How many minutes did the line stop yesterday?” The answer was twenty; yet the delivery box was green, because the indicator had been defined as “was the daily plan met” and the team had met it with overtime. The indicator was changed to pieces completed within planned time. The next week the board turned red, the die sensor was written in the reason line and the first real action was opened. The green board had shown not that the team was doing well but that the indicator was blind.

The lesson of the example is simple: if the board does not ask the right question, it cannot give the right answer. An indicator's definition is reviewed not once a year but whenever red never appears.

Sample company · demo dataGemba board presentation view: landscape for a monitor
Gemba board presentation view

How it is done in Gemy

  • The Gemba board is the digital counterpart of the meeting whiteboard: SQCD calendars are marked green or red each day and there is a monthly calendar view.
  • Indicators are entered by hand or come from the system; how system indicators such as accident-free days, open actions and participation are calculated is explained with real dates.
  • An action opened in the meeting lands on the central list; it appears in the owner's My work list, is marked overdue when the due date passes and a reminder goes out.
  • Cell boards roll up into department boards and department boards into the plant board; a senior manager can drill down to the source. Where each box sits is set per board.
  • There is a landscape presentation view for a monitor; the board can be exported as a PDF.

There is no automatic data link from machines or a production system; production and quality figures are entered by hand or through Excel. The board does not hold the meeting; it shows what to look at and what became of yesterday's promises. Answering the red is still the team's job.

In short

The Gemba board is where the team looks at the same four questions every morning. An indicator is a number the team can influence, read daily, with a known source. The board reads from left to right in the order calendar, reason and action; the meeting follows the same order in ten minutes. What kills a board is not missing data but unanswered red days; what keeps it alive is a senior manager who comes to ask rather than to inspect.

Sources

You may copy and share this article with attribution (Gemy, https://www.gemydigital.com/en/blog/gemba-panosu-nasil-kurulur-sqcd-gostergeleri-ve-gunluk-toplanti).