Shortening changeovers with SMED
Tying the shorter changeover to the standard
Shortening internal steps, writing the new sequence as standard work and following the time.
- Level:
- Practitioner
- Who it is for:
- Shift supervisor, Lean and OPEX specialist, Maintenance and calibration lead
- Duration:
- 1 min
In this lesson
- Choose ways to shorten the remaining internal steps
- Write the new changeover as standard work
- Follow the time at every changeover
Once internal and external steps are separated, the remaining internal steps come next. The gain here comes from small changes, but each one is lost unless it is tied to a written standard.
Shorten internal steps
- Use quick fasteners instead of bolts that take many turns.
- Position with fixed stops and marks instead of finding the setting by measuring.
- Do the steps two people can work on at once in parallel.
For parallel work, write a sequence in which the two people do not wait for each other. With parallel steps, the longest branch sets the changeover time.
Write down the new sequence
Write the new changeover as standard work: the order of the steps, who does each, its time and the tools needed. A photo or a short video teaches more readily than a written sequence.
Write the standard together with the team that does the changeover and teach it the same way to every shift.
Follow the time
Keep recording the time of every changeover. When a changeover takes longer, first look for the step that departed from the standard. If a better way is found, update the standard.
Check yourself
There is no score; tap a question to see the answer.
What sets the changeover time with parallel steps?
The longest branch; the other branches run at the same time.
Why does a shorter time slip back?
When the new sequence is not tied to a written standard and taught the same way to every shift.