SMED field guide: the first changeover analysis

Preparing the first SMED analysis, recording the changeover and what you should have at the end of it.

Level:
Practitioner
Who it is for:
Shift supervisor, Lean and OPEX specialist

Preparation

  • Choose the changeover to analyse and its date with the team that does it.
  • Get the team's agreement to filming and choose where to film from.
  • Prepare an empty table or a time study form for the step list.

Steps

  1. Film the changeover

    Film without a break from the last piece of the completed run to the first good piece of the new run. Ask the team to work as usual.

  2. List the steps

    Watch the video with the team; write each step, its time and who did it.

  3. Mark internal and external

    Decide together for each step whether it can be done while the machine runs.

  4. Pick the first tasks

    Set a preparation list and an owner for the external steps to move out of the stoppage.

Output

At the end of the analysis you have a step list with times, and each step is marked internal or external. You also have a preparation list for the external steps and its owner.

Templates

  • SMED observation form

    Every template comes in three levels and three formats: Basic is a one-page blank form; Detailed adds guidance and an example row; Complete adds a guide, a filled-in example and a checklist.

    The template files are in Turkish.

Back to the topic

Sources

  1. Single Minute Exchange of Die, Lean Enterprise Institute (accessed 16 November 2026)
  2. Changeover, Lean Enterprise Institute (accessed 16 November 2026)

Cookies

Essential cookies are needed for the site to work. Analytics cookies load only if you allow them; declining is as easy as accepting. You can change your choice at any time via the footer link.

Cookie policyPrivacy notice