Field guide
Gemba field guide: the first walk
Preparing the first gemba walk, the steps on the floor and what you should have at the end of it.
- Level:
- Introductory
- Who it is for:
- Shift supervisor, Plant manager
Preparation
- Write the area you will walk and the aim of the walk in one sentence.
- Print the walk list and change the questions that do not fit your area.
- Tell the area owner the time of the walk in advance.
- Learn the area's PPE and safety rules; on the walk stay on marked walkways and keep away from running machines.
Steps
Watch the area
Only look for a few minutes; pay attention to the flow, the part and the board.
Ask the list
Ask each heading's open question to the person doing the job and note the answer in their words.
Write the observation
For every problem you see, write the place, the time and the count.
Set the action
Write an owner and a due date for each problem; decide together with the team.
Output
At the end of the walk you have a filled-in walk list. For every problem you saw, an action with an owner and a due date is set as well.
Templates
Gemba walk checklist
Sources
- Gemba, Lean Enterprise Institute (accessed 16 November 2026)
- Genchi Genbutsu, Lean Enterprise Institute (accessed 16 November 2026)