Management of change (MOC)

Assessing the impact of a change

Recognising a change, splitting its impact into linked work, tracking a temporary change and checking before start-up.

Level:
Practitioner
Who it is for:
Quality engineer, Maintenance and calibration lead, Safety specialist
Duration:
2 min

In this lesson

  • Tell a change apart from maintenance work
  • Split the impact into linked work and give each an owner
  • Check before and after start-up

Management of change is not an approval signature. It is finding and finishing, in advance, every piece of work the change touches. An impact nobody finds shows up on the floor after start-up.

What counts as a change?

In HSE's description, a change can be to procedures, plant and equipment, people or substances. Under OSHA's rule, a replacement that satisfies the design specification is not a change. If you are not sure, open the request; the assessment answers the question for you.

Split the impact into linked work

  • Do risk assessment and FMEA rows need another review?
  • Does a work instruction, maintenance instruction or control plan change?
  • Who is informed and who is trained?
  • Is a device, its calibration or the spare parts list affected?

For every question you answer yes, write it down as a task and give it an owner. HSE notes that a change can affect a distant part of the plant; do not limit the impact list to the changed machine.

Temporary change

Give a temporary change an end date, and on that day decide whether it becomes permanent or is reversed. If it becomes permanent, it is assessed again like a permanent change.

Before and after start-up

Before start-up, see on site that the change was made as designed and that the linked work is done. After a period of running, review the expected result and whether there is a new hazard.

Substantial change to machinery

A provision of Türkiye's Machinery Safety Regulation comes into force on 20 January 2027. Under it, a person who makes a substantial change affecting a machine's safety is treated as its manufacturer. The regulation excludes a non-professional user who makes the change for their own use. Whether a change falls under this definition is a legal assessment and belongs to your company's expert.

Check yourself

There is no score; tap a question to see the answer.

Does replacing a part with one of the same specification fall under management of change?

No; that is maintenance work. If the specification changes, it is assessed as a change.

Why does a temporary change need an end date?

Without an end date, the temporary fix becomes permanent without anyone tracking it.

Who decides whether a change to a machine is a substantial change?

It is a legal assessment; the expert the company authorises decides.

Sources

  1. 1910.119 Process safety management of highly hazardous chemicals, (l) Management of change, Occupational Safety and Health Administration (OSHA) (accessed 16 November 2026)
  2. Plant modification / Change procedures, Health and Safety Executive (HSE) (accessed 16 November 2026)
  3. Makine Emniyeti Yönetmeliği (Resmî Gazete 16.10.2026, sayı 33402), T.C. Resmî Gazete (accessed 16 November 2026)