Document control: versions, approval, reading
Document versions, approval and reading
Opening a revision with a change summary, taking it through approval, withdrawing the old version and seeing that it is read.
- Level:
- Introductory
- Who it is for:
- Quality engineer, Shift supervisor
- Duration:
- 1 min
In this lesson
- Open a revision with a change summary
- Take the old version out of use when the new one comes into force
- Tie reading to understanding the change
The question of document control is simple: is the person at the machine reading the right version? It is answered in four steps: version, approval, release and reading.
Version and change summary
Give every document a number and a revision number. In a new revision, write what changed in a summary of two or three sentences. The reader reads this summary first, not the whole document.
Approval
Before release, have someone who knows the job review the document for fitness and adequacy. Keep who approved it and when on record next to the document.
Release and the old version
- Write the effective date; for a document dated ahead, the old version stays valid until that day.
- When the new version comes into force, collect old printed copies from the floor.
- Do not delete the old version; keep it in the archive, but not where the work is done.
Reading
Decide at the start who needs to read the document. A reading record shows that the person stated they read the document; it does not show that they understood the change. To see that the change was understood, watch the job on the floor or ask a short question.
Check yourself
There is no score; tap a question to see the answer.
Why is a change summary needed?
The reader sees what changed without comparing the whole document.
Why is the old version archived rather than deleted?
You may need to show which version was used in the past; but it must not stay where the work is done.
What does a reading record show, and what does it not show?
It shows that the person stated they read it; it does not show that the change was understood.