Permit to work field guide: issue to close-out
Preparing one permit, putting controls in place on the floor, the handover and close-out steps, and what you have at the end.
- Level:
- Practitioner
- Who it is for:
- Safety specialist, Shift supervisor, Maintenance and calibration lead
Preparation
- Take the job's risk assessment and, if a chemical is involved, its safety data sheet with you.
- List the people who will do the work and their valid documents.
- Find out whether any other permit will run on the same equipment or in the same area.
Steps
Prepare the permit
Write the job, the place, the duration, the hazards and the controls on the permit; add the workers by name.
Get the preconditions and approval
Check the workers' preconditions against the last day of the job; have an authorised person approve the permit.
Put the controls in place
Isolate energy, do the gas test, clear the surroundings and tick each control on the permit. Before work starts, the authorised person sees the controls on site. In a confined space, keep a standby person outside and have rescue arrangements ready before work starts.
Brief the workers
Before starting, talk through the hazards and controls with the team on site; the team signs.
Hand over or close
Leave unfinished work safe and hand it over; for finished work, check the area and close the permit.
Output
At the end you have a permit whose controls were done and ticked on the floor, signed by the workers, with its close-out written down. For unfinished work there is also a clear handover note given to the next shift.
Sources
- Permit to work systems, Health and Safety Executive (HSE) (accessed 16 November 2026)
- HSG250 Guidance on permit-to-work systems: A guide for the petroleum, chemical and allied industries (2005), Health and Safety Executive (HSE) (accessed 16 November 2026)