Hoshin Kanri and the X-matrix
Catchball and the monthly review
Settling objectives through dialogue between levels, and how the monthly review runs.
- Level:
- Advanced
- Who it is for:
- Plant manager, Strategy and planning lead
- Duration:
- 1 min
In this lesson
- Run a catchball conversation
- Read the monthly tracking chart
- Write a countermeasure for a deviation
In Hoshin Kanri an objective does not come down as an order. The upper level proposes an objective, and the level below says what it needs and what is realistic. This back-and-forth is called catchball.
How does catchball work?
Share the objective together with its reason. Ask the level below for its own plan and the obstacles it sees. If resources or time fall short, change the objective, scope or schedule together.
Monthly review
Open a row for each indicator and write the months as columns. Each month, put target and actual side by side; a month where the actual misses the target is marked. Where higher is better that means below target; where lower is better, above it.
Write a countermeasure for a deviation
A marked month is on the meeting agenda. The owner brings the cause of the deviation and a countermeasure on a short page. If the same indicator deviates month after month, take the problem into an A3.
- Discuss only the deviating indicators in the meeting.
- Give every countermeasure an owner and a date.
- Check the effect of the measure the following month.
Check yourself
There is no score; tap a question to see the answer.
Why is catchball done?
So that the objective is realistic and settled together with the lower level's plan.
What happens if the same indicator keeps deviating?
The problem moves into a detailed problem-solving effort, such as an A3.