Writing the significance criteria before scoring, thinking about the aspect under three conditions and recording the significance decision with its reason.

Level:
Practitioner
Who it is for:
Safety specialist, Quality engineer
Duration:
1 min

In this lesson

  • Write the significance criteria before scoring
  • Think about the aspect under normal, abnormal and emergency conditions
  • Record the significance decision with its basis

Not every environmental aspect carries the same weight. The significance assessment separates the aspects that need a control and a target from the rest. The split can be repeated only with written criteria that everyone reads the same way.

Write the criteria before scoring

EPA's management system guidance gives examples of criteria. The company can build its own list from them:

  • How often the activity takes place.
  • The possible consequence of the impact: how much harm it could do.
  • Whether a legal or other compliance obligation applies to the aspect.
  • How much interested parties, such as neighbours or customers, care about the aspect.

Give each step of each criterion a written meaning. With the sum method, a high score on one criterion can be balanced by the others. With the product method, a single low score pulls the result far down.

Think about the three conditions separately

The same activity carries different aspects in normal running, in an abnormal situation and in an emergency. Tank filling normally gives off vapour; if it overflows, there is a spill on the ground. Score each condition on its own row.

Record the decision with its basis

Write the basis of the significance decision: a score that reaches the threshold, a legal requirement or a manual decision with a reason. When the criteria or the threshold change, look at all aspects again. Renew the assessment when the process changes, too.

Check yourself

There is no score; tap a question to see the answer.

Why do you write the criteria before scoring?

Criteria chosen after seeing the score pull the decision towards a wanted result; criteria written in advance apply the same way to every aspect.

Why do you score the same activity under three conditions?

Abnormal and emergency situations such as overflows or breakdowns bring out aspects that normal running does not show.

Sources

  1. Plan - Initial Development of an EMS, U.S. Environmental Protection Agency (accessed 16 November 2026)
  2. Basics of an EMS, U.S. Environmental Protection Agency (accessed 16 November 2026)
  3. ISO 14001:2026 Environmental management systems, Requirements with guidance for use, International Organization for Standardization (ISO) (accessed 16 November 2026)

Cookies

Essential cookies are needed for the site to work. Analytics cookies load only if you allow them; declining is as easy as accepting. You can change your choice at any time via the footer link.

Cookie policyPrivacy notice